Please Call Before Collecting
Complete construction hoarding systems • Panels, posts, feet, bracing & gates • Ideal for construction sites, demolition projects, town centre works, restricted areas & temporary site boundaries • Quick to install with no groundworks needed • Stable, weather-resistant and built to meet council requirements • Fully modular - add gates, signage or printed branding.





When vehicles and people share the same ground, the right barrier is what keeps the two apart. Our traffic management range covers everything from lightweight Chapter 8 delineation for roadside works through to a crash-tested barrier built to stop a vehicle at 50mph. Whatever you’re separating, a footpath from a dig, a work crew from live traffic, or the public from a site entrance, there’s a barrier here sized to the risk. All are available to buy outright, UK-made where stated, with fast delivery and discounts on larger orders.
The barrier you need comes down to one thing: what’s behind it, and how fast traffic is moving past it. Spend more than you need and you’ve over-engineered a footpath; spend too little near live traffic and the barrier is decoration. Here’s the simple way to match the job to the kit.
Guiding and marking (low risk, slow or no traffic). For roadside works, utility digs and pedestrian routing where you’re directing people rather than stopping vehicles, the Chapter 8 Barrier is the standard choice, high-visibility, HDPE, quick to interlock and reposition. The Evo Barrier gives you a water-filled option at a similar entry price when you want a bit more presence on the ground.
Defining a perimeter (moderate risk, site separation). Where you need a heavier, more stable line, keeping the public out of a compound, splitting pedestrian and vehicle routes on site, or holding a perimeter that won’t get nudged out of place, the water-filled RB2000 and the heavy-duty Titan Barrier carry more weight and hold a line better than lightweight delineation.
Genuine impact protection (live or fast traffic). When a vehicle could actually leave the carriageway, live highways, fast site entrances, anywhere a strike has real consequences, only a crash-tested barrier will do. The RB22 is crash-tested free-standing to 50mph (80km/h) under BS EN 1317-N1, so it brings a wayward vehicle to a controlled stop rather than simply marking the hazard.
For temporary works on or near UK roads, Chapter 8 of the Traffic Signs Manual is the reference point most projects work to, it’s the recognised standard for how temporary signing and barriers should be set out. For barriers expected to contain or redirect a vehicle, the relevant standard is BS EN 1317, which is what crash ratings like the RB22’s 50mph performance are tested against. On exposed or roadside sites, wind loading also matters lightweight barriers should be correctly ballasted or water-filled to stay stable. If you’re unsure what your site requires, check with your traffic management plan or give us a call before you order, it’s easier to get it right first time.
One of the most common questions contractors ask is whether site hoarding or temporary fencing is the best solution for their project.
Temporary mesh fencing is often chosen for short-term projects where visibility through the fence line is not a concern. It provides a quick and cost-effective method of securing a site perimeter while maintaining visibility.
Site hoarding, however, offers a higher level of privacy and a more professional appearance. The solid panel design helps conceal site activities, equipment and materials while creating a stronger visual barrier between the public and active construction works.
For projects located in town centres, residential developments, retail environments or high-profile construction sites, site hoarding is often the preferred choice due to its enhanced security, privacy and presentation benefits.
Our traffic management range is used across:
We supply to buy, not hire, so the kit is yours to redeploy across as many jobs as you like. Most of these barriers drain, stack and store flat for the next site. Orders are typically delivered in 2–5 working days, and click-and-collect is available from our base in Aldingbourne, West Sussex (please call first to arrange). Ordering for a larger project? We offer discounts on bulk orders, get in touch for a quote.
It’s used to separate vehicles from people and to guide traffic safely around a hazard, roadworks, site entrances, events and temporary diversions. Depending on the risk, that ranges from high-visibility delineation that simply marks a route, through to crash-tested barriers that physically contain a vehicle.
“Chapter 8” refers to Chapter 8 of the Traffic Signs Manual, the UK guidance for temporary roadworks and situations. A Chapter 8 barrier is a high-visibility, red-and-white HDPE barrier used to mark and protect roadside work zones and guide pedestrians and vehicles past them.
Yes. Empty, a water-filled barrier is light and acts only as a visual marker. The protection comes from the ballast weight once it’s filled on site, that mass is what holds the line and, on a crash-tested unit, absorbs and redirects an impact. Treat any unfilled barrier as a marker only.
For anywhere a vehicle could leave the carriageway at speed, choose a crash-tested barrier such as the RB22, which is tested to 50mph under BS EN 1317-N1. Lightweight Chapter 8 or low-level water-filled barriers are for guiding and marking, not for stopping a moving vehicle.
The RB22 is crash-tested free-standing to 50mph (80km/h) under BS EN 1317-N1. The lighter barriers in the range are designed for delineation, pedestrian management and site separation rather than vehicle containment, check each product page for its intended use.
Divide the length of your run by the length of a single barrier. The RB22, for example, covers 2 linear metres per unit, so a 20m run needs 10. Add end sections or angle pieces if your layout turns a corner or needs a defined start and finish.
Yes to both. Delivery is usually 2–5 working days, and click-and-collect is available from Aldingbourne, West Sussex. Please call first so we can have your order ready.
Tell us what you’re separating and how fast traffic moves past it, and we’ll point you to the right barrier, no over-spec, no guesswork. Buy online for delivery in 2–5 working days or call for a bulk quote.
Call 01243 767080 · Email sales@maysdirect.co.uk